385
the whole of the time,
Engineer
of
the Ass!
and Coo: Land Dunvary af
has been devoted, to the Surveying of Crown Lando, preparing plans and particulars for Land Sales,
andr
for how Leaoro, Consequentlyh Surveyor General, has
the Qa
22.67
and prepare nearly all
te
been obliged, to inspect the Public Buildings, Povads . Streets Sewers. Bridges, the Drawings, Sperifications
for the new worths, and the
required for their maintenance,
Check the Contractors Bille for the
refours
works when Executed to te, worko
hitherto freef.
arned
by the Assistant
Surveyor General, Assistant Enginee
and Clack of Forke.
It
therefore
anx the
proposed, to trans for, the Land surveys,
the Land Survey Branch.
Quarterly Inspection, of a portion, of
the Public Buildings, formerly Camed
520007,
to the
out big M. Leigh's prede
additional Clerk of Forks, in order,
to allow the Assistant Engineer
to devote his time, to the
preparation of
Drawings for
Koase. Grains, Savers . Iharves.
ara
other Engineering Froots and
Buildings, and to oupiersice generally.
the Drawing Office
the duction
of
The two Cleste of Works, to
lake charges, of all the Public Buildings, impact them. Quartrady,
Estimated
and prepare the necessary Specifications &c, for the repairs
required for their
aintenance,
and suf-vise the Execution of
such repairs. Check the Contracion
Billo fc.
Survey Branch. The propoved; Land Surveyor
for and Goo? Lands Surveyor, would devote the whole
of
their time to the Surveying
unde
Paying out of Crown Lands, pre-
paring plano and particulars
Jor Land Fulco, and for
Leaves, they should also supervises
Dav
the Squatters.
and rafvert
on all
applications for Squatters Lecanoco,
No comments yet.
Private notes are available after approval.